
Manuals
What the national manual contains.
240 documents. An index of the documents of the EXPRO National Manual for Projects Management, issued by the Expenditure and Projects Efficiency Authority, Saudi Arabia. Every document number and revision below was read off the document's own first page.
This page is an index. No content from any document appears here or anywhere else on this site.
Revisions checked on 13 September 2026
Each document is marked by the authority that wrote it and carries a notice reserving its rights, so this page points to the documents and does not reproduce them. Each revision number on this page was checked against the document’s own first page. The authority revises these documents and marks updated volumes on its own knowledge centre. For the current revision of any document, and for its Arabic edition, go to the issuer rather than to this page: Expenditure and Projects Efficiency Authority, Saudi Arabia
The catalogue
The volumes
Volume names in English are taken from each volume's own introduction chapter rather than invented; in Arabic they are the short labels the authority itself uses, which is the one place here that rests on a listing rather than a document. Chapter titles are printed as the documents' own English first pages print them, in both editions. Where a volume covers a discipline this publication has nothing useful to say about, it is indexed and marked out of scope, because leaving a volume out would make the catalogue incomplete.
- Vol 01Introduction and guidelineمقدمة
- Vol 02Project registrationتسجيل المشروع
- Vol 03Initial planningالتخطيط الأولي للمشروع
- Vol 04Contracts and tenderingالعقود
- Vol 05Procurementالمشتريات
- Vol 06Engineeringالتصميم والهندسة
- Vol 07Project controls and reportingضبط المشاريع وإعداد التقارير
- Vol 08Information and communications technology outside what this site coversتكنولوجيا المعلومات والاتصالات
- Vol 09Construction managementالإنشاءات
- Vol 10Testing and commissioningالاختبارات والتشغيل التجريبي
- Vol 11Health, safety, security and environment outside what this site coversالصحة والسلامة والبيئة
- Vol 12Qualityالجودة
- Vol 13Risk managementالمخاطر
- Vol 14Document managementإدارة الوثائق
- Vol 15Sustainability outside what this site coversالاستدامة
- Vol 16Project turnover and closeoutالإغلاق والتسليم
How the catalogue was verified
Every document number, revision, volume and chapter was checked against the first page of the document itself, not taken from a filename.
A document is listed when its first page identifies its volume and chapter and the issuer marks it for external use. Deliverable lists, standard drawings and annexes carry no volume and chapter identification, so they are not listed.
