Manuals · Volume 11

Health, safety, security and environment

61 documents across 5 chapters of the EXPRO National Manual for Projects Management, issued by the Expenditure and Projects Efficiency Authority, Saudi Arabia. الصحة والسلامة والبيئة

61 documents5 chaptersRevisions as at 13 September 2026

No parent standard is named for this volume.

This volume covers a discipline with its own standards and its own professionals, and outside what this publication has anything useful to say about. It is indexed so that the catalogue is complete, and marked out of scope because an index entry is not a claim of expertise.

Chapter 1

3 documents

TitleDocumentRev
Project HSSE IntroductionEPM-KS0-GL-000001002Arabic ed. 000
Project New Employee HSSE Summary FlyerEPM-KS0-MN-000001003
Project Sub-contractor HSSE Evaluation,EPM-KS0-PL-000002003Arabic ed. 000

Chapter 2

21 documents

TitleDocumentRev
EPM-KS0-MN-000002EPM-KS0-MN-000002000Arabic ed. 000
CRAFT SAFETY POCKET BOOKEPM-KS0-MN-000003001Arabic ed. 000
Project Development and Planning Process PlanEPM-KS0-PL-000001003Arabic ed. 000
Project HSSE Orientation and Training PlanEPM-KS0-PL-000003003
Project Incident Notification, Investigation andEPM-KS0-PR-000001003
Project HSSE Assessment Process ProcedureEPM-KS0-PR-000002003
Project Hazardous Work Permit ProcedureEPM-KSS-PR-000016003
Project Crane and Lifting Operation ProcedureEPM-KSS-PR-000018003Arabic ed. 000
Project Demolition ProcedureEPM-KSS-PR-000019003
Project Welding Operation ProcedureEPM-KSS-PR-000020003
Project Electrical Safety ProcedureEPM-KSS-PR-000021003
Project Non-Destructive Examination ProcedureEPM-KSS-PR-000022003Arabic ed. 000
Project Vehicle Safety Management ProcedureEPM-KSS-PR-000023003
Project Hazard Communication ProcedureEPM-KSS-PR-000024003
Project Office Facilities ProcedureEPM-KSS-PR-000025003
Project Utility Clearance ProcedureEPM-KSS-PR-000026003
Project Manual Material Handling ProcedureEPM-KSS-PR-000027003
Project Floor and Wall Openings ProcedureEPM-KSS-PR-000028003
Project Roofing Work ProcedureEPM-KSS-PR-000029003
Project Scaffolding Control Management ProcedureEPM-KSS-PR-000033003
Project Piling Operations ProcedureEPM-KSS-PR-000035003

Chapter 3

21 documents

TitleDocumentRev
Project General Safe Working RequirementsEPM-KSS-PR-000001003
Project Housekeeping Requirements ProcedureEPM-KSS-PR-000002003
Project Personal Protective Equipment ProcedureEPM-KSS-PR-000003003Arabic ed. 000
Project Fire Prevention and Protection ProcedureEPM-KSS-PR-000004003
Project Fall Protection ProcedureEPM-KSS-PR-000005004
Project Barricades and Signs ProcedureEPM-KSS-PR-000006003
Project Confined Space Entry ProcedureEPM-KSS-PR-000007003
Project Elevated Work Platform ProcedureEPM-KSS-PR-000008003
Project Compressed Gas Cylinder ProcedureEPM-KSS-PR-000009003
Project Night Works ProcedureEPM-KSS-PR-000010003
Project Portable Ladders Inspection and ControlEPM-KSS-PR-000011003
Project Drinking Water ProcedureEPM-KSS-PR-000012003
Project Work Over or Near Water ProcedureEPM-KSS-PR-000013003
Project Emergency Preparedness ProcedureEPM-KSS-PR-000014003
Project Suspended Personal Platform ProcedureEPM-KSS-PR-000015003
Project Powered Industrial Trucks ProcedureEPM-KSS-PR-000017003
Project Safety Watches ProcedureEPM-KSS-PR-000030003
Project Lockout/Tagout ProcedureEPM-KSS-PR-000031003
Project Excavation and Trenching ProcedureEPM-KSS-PR-000032003
Project Road Works ProcedureEPM-KSS-PR-000034003
Project Powder Actuated Tools ProcedureEPM-KSS-PR-000037003

Chapter 4

11 documents

TitleDocumentRev
Project Medical Services and Medical SurveillanceEPM-KSH-PR-000001003
Project Occupational Health and Industrial HygieneEPM-KSH-PR-000002003
Project Occupational Health Records MaintenanceEPM-KSH-PR-000003003
Project Respiratory Protective Equipment ProcedureEPM-KSH-PR-000004003
Project Air Surveillance Program ProcedureEPM-KSH-PR-000005003
Project Labor Accommodation Sanitation andEPM-KSH-PR-000006003
Project Control of Hazardous Materials ProcedureEPM-KSH-PR-000007003
Project Heat Stress Management ProcedureEPM-KSH-PR-000008003
Project Asbestos Management ProcedureEPM-KSH-PR-000009003
Project Hearing Conservation Program ProcedureEPM-KSH-PR-000010003Arabic ed. 000
Project Site Work Security ProcedureEPM-KSJ-PR-000001002

Chapter 5

5 documents

TitleDocumentRev
Project Pollution Control ProcedureEPM-KSE-PR-000001003
Project Waste Management ProcedureEPM-KSE-PR-000002003
Project Environmental Training and AwarenessEPM-KSE-PR-000003003
Project Compliance Evaluation ProcedureEPM-KSE-PR-000004003
Project Medical Services and Medical ManagementEPM-KSH-PL-000001003

Every document above is marked external by the issuing authority and carries a notice reserving its rights. This page lists what exists and reproduces none of it. Document numbers and revisions were read from each document’s own first page; where a page carried no revision, the column says so rather than assuming one. Titles are printed as printed, in whichever language the document carries them.