Skip to content
Projects Advisors

Manuals · Volume 6

Engineering

56 documents across 7 chapters of the EXPRO National Manual for Projects Management, issued by the Expenditure and Projects Efficiency Authority, Saudi Arabia. التصميم والهندسة

56 documents7 chaptersRevisions as at 13 September 2026

No parent standard is named for this volume.

Chapter 1

1 document

TitleDocumentRev
Engineering IntroductionEPM-KE0-GL-000010004Arabic ed. 000

Chapter 2

1 document

TitleDocumentRev
Definitions and ReferencesEPM-KE0-GL-000011003Arabic ed. 000

Chapter 3

8 documents

TitleDocumentRev
Technical Standardization PlanEPM-EN0-PL-000001002Arabic ed. 000
General Engineering ProceduresEPM-KE0-GL-000012004Arabic ed. 000
Development and Implementation of DesignEPM-KE0-PR-000001004Arabic ed. 000
Design Review ProcedureEPM-KE0-PR-000002004
Calculations ProcedureEPM-KE0-PR-000003005Arabic ed. 000
Engineering Close out ProcedureEPM-KE0-PR-000004004Arabic ed. 000
Development of Service Requisition - ProcedureEPM-KE0-PR-000006003
Design Change Notice ProcedureEPM-KE0-PR-000009004Arabic ed. 000

Chapter 4

1 document

TitleDocumentRev
Units of MeasurementEPM-KE0-GL-000013004Arabic ed. 000

Chapter 5

1 document

TitleDocumentRev
Codes, Standards & ReferencesEPM-KE0-GL-000014004Arabic ed. 000

Chapter 6

7 documents

TitleDocumentRev
Project Submission Standards and RequirementsEPM-KE0-GL-000015003Arabic ed. 000
Standard Drawing Template GuideEPM-KE0-GL-000018005Arabic ed. 000
Entity Automation & Information ManagementEPM-KE0-GL-000019001Arabic ed. 000
Project Automation Requirements & DeliverablesEPM-KE0-GL-000020001Arabic ed. 000
CAD Standards ProcedureEPM-KE0-PR-000008003Arabic ed. 000
3D Model Review ProcedureEPM-KE0-PR-000010001Arabic ed. 000
Graphical Blocks and Symbols GuideEPM-KED-GL-000001001Arabic ed. 000

Chapter 7

37 documents

TitleDocumentRev
Environmental GuidelineEPM-KE0-GL-000001003Arabic ed. 000
Geotechnical GuidelineEPM-KE0-GL-000002003Arabic ed. 000
Improving Energy and Water Consumption inEPM-KE0-GL-000004003Arabic ed. 000
ELV System Integration GuidelineEPM-KE0-GL-000007002Arabic ed. 000
Fire and Life Safety System Integration GuidelineEPM-KE0-GL-000008002Arabic ed. 000
Building Management System and MechanicalEPM-KE0-GL-000009002Arabic ed. 000
General Design GuidelineEPM-KE0-GL-000016004Arabic ed. 000
Verification and Validation of Computer ProgramsEPM-KE0-PR-000011001Arabic ed. 000
List of Commonly Used Design and EngineeringEPM-KE0-RG-000009002Arabic ed. 000
Architectural Design GuidelinesEPM-KEA-GL-000001003Arabic ed. 000
Architectural Design AidsEPM-KEA-GL-000002002Arabic ed. 000
Door and Window Schedule GuidelinesEPM-KEA-GL-000003002Arabic ed. 000
Universal Accessibility GuidelinesEPM-KEA-GL-000004003Arabic ed. 000
Program of Rooms/Spaces for Building DesignEPM-KEA-GL-000006003Arabic ed. 000
Material Finish Schedule GuidelinesEPM-KEA-GL-000007003Arabic ed. 000
Escalator Data Sheet GuidelinesEPM-KEA-GL-000008003Arabic ed. 000
Elevator Data Sheet GuidelinesEPM-KEA-GL-000009003Arabic ed. 000
Encroachment Permits ProcedureEPM-KEA-PR-000001003
Saudi Arabian Archaeological RegulationsEPM-KEA-PR-000002003Arabic ed. 000
Civil Design GuidelineEPM-KEC-GL-000001003Arabic ed. 000
Civil (Site Works and Roads) Design AidsEPM-KEC-GL-000002003Arabic ed. 000
Utilities Design AidsEPM-KEC-GL-000003003Arabic ed. 000
Utilities Design GuidelineEPM-KEC-GL-000004003Arabic ed. 000
Surveying GuidelineEPM-KEC-GL-000005003Arabic ed. 000
Exterior Signage Criteria - ProcedureEPM-KEC-PR-000001003Arabic ed. 000
List of Civil DeliverablesEPM-KEC-RG-000002003Arabic ed. 000
Electrical Design GuidelineEPM-KEE-GL-000001003Arabic ed. 000
ELV System Design GuidelineEPM-KEE-GL-000002004Arabic ed. 000
Electrical Design AidsEPM-KEE-GL-000003003Arabic ed. 000
ELV System Design AidsEPM-KEE-GL-000004004Arabic ed. 000
Mechanical Design GuidelinesEPM-KEM-GL-000001003Arabic ed. 000
Mechanical Design AidsEPM-KEM-GL-000002003Arabic ed. 000
District Cooling Design GuidelineEPM-KEM-GL-000003002Arabic ed. 000
Coastal Marine Design AidsEPM-KER-GL-000001003Arabic ed. 000
Coastal & Marine Design GuidelineEPM-KER-GL-000002003Arabic ed. 000
Structural Design GuidelinesEPM-KES-GL-000001003Arabic ed. 000
Structural Design AidsEPM-KES-GL-000002003Arabic ed. 000

Every document above is marked external by the issuing authority and carries a notice reserving its rights. This page lists what exists and reproduces none of it. Document numbers and revisions were read from each document’s own first page; where a page carried no revision, the column says so rather than assuming one. Titles are printed as printed, in whichever language the document carries them.