Knowledge, as distinct from information

Has anyone captured why the asset is the way it is, and what was accepted rather than resolved?

What goes wrong without it

Design intent is part of what an owner inherits, and it may not be recorded at all. An operator who does not know why a system was configured a particular way cannot safely change it, and will eventually either leave a defect alone or introduce one while fixing it. A large project can also end with a private list of things accepted rather than resolved, held in people’s heads and in email. That list can be what operations most needs, and it is not a deliverable unless someone makes it one.

What to examine

4 tests

  1. Ask, in writing and before demobilisation, what was accepted rather than resolved.
  2. Check whether design intent is recorded anywhere other than in the drawings.
  3. Identify which individuals hold undocumented knowledge and whether any mechanism exists to transfer it before they leave. If the only mechanism is a leaving date, record that.
  4. Test whether the organisation has determined what knowledge is necessary for the operation of its assets, which the second edition now requires explicitly.

Required by

  • ISO 55001:2024, Clause 7.7, knowledge, new in the second edition and listed by ISO among the main changes from the 2014 edition.
  • ISO 19650-3, information management during the operational phase of assets.

Read the sources

  • ISO 55001:2024, asset management system requirements2024 edition; read 2026-09-26.ISO’s product page: the publication details and ISO’s own summary of the standard, not the requirement text. The contents, foreword and introduction cited in this publication are taken from the standard’s preview pages hosted on the ANSI webstore, not from this page.

How the method applies it

A step of the asset lifecycle method: Knowledge capture.

direct The means produces evidence at least one of the tests above asks for. A reading, and labelled as one.

In the asset lifecycle methodThe steps of the two methods that this domain examines.

Cite this page

Projects Advisors, “03.2 Knowledge, as distinct from information,” revised 2026-10-08, https://projects-advisors.com/framework/handover-and-transition/knowledge-transfer