Skip to content
Glossary

As-built records

The record of what was actually constructed, as distinct from what was designed, handed to the owner as a condition of taking over.

As-built records document the asset in its delivered condition: the drawings, specifications, equipment schedules, test results and operating and maintenance information that describe what exists rather than what was intended. They are the basis on which an owner can later maintain, modify, value or dispose of the asset.

The 2017 edition of the FIDIC conditions of contract made the supply of as-built records, operating and maintenance manuals and training, where the contract calls for them, an express condition of taking over under Sub-Clause 10.1: the works are not ready for taking over until the required Notices of No-objection have been given or deemed given and the required training has been completed. Under the earlier editions the obligation existed but sat outside the taking-over condition, which made it easier to defer.

Sources

FIDIC Conditions of Contract, 2017 edition, Sub-Clause 10.1, compared with the 1999 edition. FIDIC, press release, Rainbow Suite, second edition of the Red, Yellow and Silver Books, March 2018, page 6, on Sub-Clause 10.1 across the three books. ISO 19650-3 on information management during the operational phase.